The DT-K series is active in all kinds of port civil engineering projects, such as installation work of wave blocks, fishing reef block sinking work, and pile driving work.
It much excels in economical that the installation and the removal of the pile leader are carried out by the crane its-self but unnecessary of assistant machine.
It is possible to drive the pile diagonally leaning forward or backward and at the both sides of vessel, the capacity of construction is much improved.
Furthermore, the working efficiency is so greatly improved that by equipping with the Pile Driving Engineering Management System, the positioning of the vessel, the pile-driving spot, the inclination angle and the height of a pile etc. are understood on monitor in real time.
We are proud of the strength and safety of the cranes that can withstand the sever sea environment and they are active not only in Japan but also overseas.
All designs and manufactures are made to order, and we design one by one according to the customer’s request and the content of the construction work.